Admission
    Admission Enquiry for 2024-25            Admission Flyer for 2024            11th Graduation Day 2024            iCAAN 2024                        2nd National Conference on Recent Innovations and Challenges in Aviation Technology (RICAT–2024)                                                        

Date

28 Feb 2023

Report for SDSC SHAR (ISRO), Sriharikota Visit

Name of the Event: SHAR, Sriharikota Visit
Resource Person: SHAR Faculty Members
Date: 28-02-2023
Time: 10.00 AM to 03.00 PM
Venue: SDSC, SHAR, Andhra Pradesh
No. of Participants: 80 (AS/AE), IV, VI and VIII Sem Students + Five AS/AE Dept. Staffs

About the Visit:

Satish Dhawan Space Centre (SDSC) SHAR, Sriharikota, the Spaceport of India, is responsible for providing Launch Base Infrastructure for the Indian Space Programme. This Centre has the facilities for solid propellant processing, static testing of solid motors, launch vehicle integration and launch operations, range operations comprising telemetry, tracking and command network and mission control centre. ACSCE Students visited SHAR,Sriharikota and got an exposure to see the mission control center, launch pads, Museum, Integration of rockets and other activities happening in SHAR, Sriharikota. The visit started at 10.00 AM.

Students got the Exposure on
  • First Launch Pad
  • Sounding rocket launch pad
  • Algorithms used
  • Mission Control Centre
  • Rocket stages integration
  • Museum at SHAR
  • Launch Vehicles
  • Library

In the visit, students had a visual exposure about two launch pads from where the rocket launching operations of SSLV, PSLV, GSLV and GSLV MK III are carried out. Apart from that they have seen the Mission control center and various operations carried out in SHAR. During the visit the SHAR Faculty has given explanation about MCC, rocket stages and integration, launch pad Umbilical Towers and sounding rocket launching. The students were expressed that this program was highly useful to them to understand the journey of ISRO and as well as to gain the knowledge on several systems used during the launch. The visit finished by 3.00 PM after taking the opinion and feedback from students.

View Event Report
CompressJPEG.online_200kb_80383